Bespoke building base-build and fit-out to suit FENZ business needs. The project included a right of way at the back of the lot to ensure ease of access for service vehicles through the center of lots as this was built chronologically after the Coca Cola project next door.
Value:
$2.4 Million
Scale:
826m² warehouse
290m² office space
325m² canopy
Type:
Base Build and Fit Out
Timeframe:
Base Build 6 months
Fit Out 4 months